Ley Choon Constructions
& Engineering Pte Ltd

 

Sungei Kadut Planning Area
Site Area: 26,000 sqm
GFA: 20,000 sqm
Project: Entire Site Development including 2 Office Buildings, Asphalt Plant and Workers Dormitory (750 Workers)
Type: Industrial
Status: Completed

2 separate neighbouring plots of land were redeveloped in phases so as to maximise the plots of land that our clients were occupying. A Y Consultants was involved in the architectural design, structural design, project management and compliance submission for this project.  

For the 1st phase, the development involved the blending together of a new 3rd Storey with the existing 1st and 2nd Storeys, as well as catering for a Worker’s Dormitory. The architectural challenge was to come up with a layout that complied with all the agencies requirements. The structural challenge here was making sure that the existing structure could take the additional loading.

 For the 2nd phase, the development involved the erection of the Asphalt Plant and the surrounding ancillary sheds (including the substation). Our clients are one of the three Asphalt Pre-mix Plants Operators in Singapore and we at A Y Consultants are proud to have been involved in the construction of this behemoth. 

The phase 3 development involved the erection of a 4-Storey Industrial Building, incorporating another Workers Dormitory. The main architectural and structural design objective was to maintain a simple and cost effective design that catered for the client's space requirements.